Production and shipment of key equipment for Rooppur and Akkuyu NPPs were completed.
Equipment for fuel collection, prototypes of control and safety system (CSS) actuators and tanks of the second main circulation pump for research and industrial reactors were supplied.
The Division underwent product certification as a supplier and secured orders for the delivery of blanks for the rotors of low-pressure, high-pressure and intermediate-pressure cylinders (HIPC) of the steam turbine for Akkuyu NPP.
JSC Atomenergomash signed a contract for the development of engineering designs and mock-ups for the Proryv Project.
Deliveries of blanks for follow-on multipurpose nuclear icebreaker (MPNI) No. 3 were completed.
The Division signed a contract for the package supply of a nuclear propulsion unit and large-size hull castings for the Lider MPNI.
A conceptual design for an optimised floating power unit was developed, and the project reached the engineering design stage.
The shipment of all boiler equipment for the first thermal solid-waste treatment plant was completed, and the shipment of equipment for the second waste-to-energy plant (out of four plants) was started.
Equipment was delivered to the Riverside waste-to-energy plant in the United Kingdom. Such cooperation opens opportunities for involvement in other European projects.
Tests of the first Russian large-capacity LNG pump for one of the leading oil and gas producers were successfully completed. The equipment was handed over to the customer.
JSC Atomenergomash was included in the list of Russian systemically important companies.