Construction of New Power
Units in Russia

Power unit No. 4
equipped with
a VVER-1000
reactor was commissioned
at Rostov NPP.

Power unit No. 1
was commissioned at
Leningrad NPP-2. This is the second
operational generation 3+
power unit in Russia
(the first one is
at Novovoronezh NPP-2).

References for
Russian power
units equipped
with VVER-1200

reactors (water-cooled
water-moderated
power reactors)
offered to
foreign partners
were confirmed.

The main stage of
construction work
was launched
at Kursk NPP-2
as concreting
started at the
construction site
of power unit No. 1.



Key Results in 2019
Key Results in 2018